Monday, February 10, 2014
More News From The Metal Shop
These are the first two completed sections and Sam and Jim oiled them up before they left today. I havent been to the house or seen the full drawing, but these two 7 sections will be installed next week and measurements will then be taken for the other 7 section that will connect them and complete the open balcony area. Then I understand there are at least two angled railings that go down the stairs ... I cant wait to see the finished house ....
Heres an end view showing the half posts that will bolt to the inset beams at the ends of the open section. The railings jut out from the posts on short angles so they can attach to the vertical edges of the beam which will provide a secure and rigid connection. Apparently there are some other angled elements on the floor below that suggested this interesting and artistic concept. Ill have to see it when its all finished.
As usual, Sam made the drawings and then Trevor cut a spacing jig on the cnc that enables Sam to quickly and accurately weld up the pieces.....
The angled jigs were a little trickier, but a lot smaller and worked slick ...
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment